A brief break-in procedure must be carried out to obtain the proper operating clearances in the engine and transmission, which are necessary for performance and reliability.
NOTICE
For the first hour or 20 km (12 miles) of operation, run the engine at low and moderate engine speeds. See details below.
Break in the engine as follows
NOTICE
When any following parts have been re-placed, the same break-in procedure as the new motorcycle must be carried out for one hour or 20 km (12 mile): Cylinder, Piston, Piston pin, Piston ring, Valve, Rocker arm, Camshaft, Crankshaft, Transmission gear, etc.
Access the comprehensive 2010-2018 VW Jetta Passenger Fuse Box Diagram to troubleshoot electrical issues effectively.…
Explore the comprehensive VW Jetta Passenger Fuse Box Diagram to troubleshoot electrical issues effectively. Understand…
Under Hood Fuse Box Location Remove the front luggage compartment cover. Under Hood Fuse Box…
2022 Kawasaki NINJA H2 SX SE Brake Lever Adjuster Owner's Manual NOTICE Only adjust the front…
2023 Land Rover Range Rover Evoque Exiting The Vehicle SINGLE LOCKING WARNING Before exiting the…
2023 Land Rover Range Rover Evoque Front Seats FRONT SEAT SAFETY Make sure to read…